5 steps to install color plate and purlin for steel buildings
Wall roof plate and purlin construction process. purlins – gutter – inner anti-hanging board – insulation layer – roofing board – ridge board.
Column beam installation instructions
Construction process for columns and beams.
Pre-installation line – steel column lifting – steel column axis, elevation, verticality correction – roof frame assembly – roof frame lifting – roof frame temporary fixing – junction high strength bolt connection Correction of verticality of roof beam – Initial and final screwing of high-strength bolts
3 steps of preparation before steel structure installation
There are three points to be noted before installation.mFoundation retesting-Retesting of pre-buried ground bolts-Pre-inspection of components.